Charts
TwFlowchart
TwFlowchart is a Blazor flowchart: the steps of a process as boxes in columns, with an arrow for every link from one step to the next.
Last updated
Please be aware this component is new, may have bugs and/or be subject to change. Please report any bugs at
https://github.com/twblazor/twblazor/issues.
Basic usage
TwFlowchart draws each ChartGraphNode as a box and each ChartGraphLink as an arrow. Steps are set out in columns from left to right, each to the right of every step that leads to it. Links refer to nodes by Id.Branches
Steps reached from the same step share a column and are stacked in the order given, so a decision fans out and its branches join again further on.
Parallel work
A pipeline that runs several jobs at once shows as a column of boxes fed by one step and feeding the next.
Setting the column
Set a node's
Stage to move it further right than its links alone would place it. Here the manual check is held back to line up with the final column of automatic checks.When to use
Use a flowchart for the steps of a process. A name too long for its box is cut short; the tooltip has it in full. Link values are not shown: to show how much flows along each link, use TwSankeyChart.
Summary
Tooltips and the table view give the source and target of each link. The arrow keys move through the steps in the order given.